Skip to main content

Product overview

One evidence trail from building survey to recovery outcome.

RubblePass is a pre-demolition coordination platform. It turns building records, field observations, documents and professional evidence into a structured material inventory, then keeps every route, reservation and custody event connected to that source record.

Decision support, not engineering certification. Safety-critical and regulated decisions remain with qualified professionals and applicable authorities.

Connected modules

The operating layer before materials become mixed waste.

Each module has a distinct job. Together they preserve the context needed to make a material decision explainable and reviewable.

Capture

Field Assessment

A mobile-first record for building attributes, zones, components, photographs, plans and observations—even when a complete BIM model does not exist.

Assess

Evidence & Uncertainty

Quantity ranges, source records, confidence, assumptions, missing information and reviewer decisions stay attached to each material line.

Decide

Circular Routing

Compare technically possible reuse, testing, recycling, storage and controlled-disposal routes using transparent decision factors.

Match

RubblePass Exchange

Prepare approved upcoming batches for private invitations or wider discovery without publishing precise source addresses.

Trace

Material Passports

Give an approved batch an opaque QR-linked identity, a controlled public view and an append-only custody timeline.

Learn

Portfolio Insights

Report estimated, reserved, collected, delivered and verified material flows as separate states instead of blending projections with outcomes.

Data progression

A material record becomes more useful as evidence improves.

RubblePass does not convert an early estimate into a verified outcome by changing a label. Every state change requires a traceable event or review decision.

  1. 01

    Preliminary record

    The assessor records visible conditions, dimensions and source documents. Unknowns remain visible.

    L0 · Preliminary
  2. 02

    Range estimate

    The inventory shows P10, P50 and P90 quantities with the assumptions and coefficient version used.

    Estimated
  3. 03

    Human review

    An authorized reviewer accepts, edits, rejects or requests additional evidence. Hazard or structural questions create a block.

    L1 / L2
  4. 04

    Route coordination

    Eligible routes are compared against condition, evidence, timing, distance and destination capability.

    Approved plan
  5. 05

    Custody evidence

    Collection, weighing, delivery and destination acceptance create the evidence required for a verified outcome.

    L3 · Verified

Built-in boundaries

Useful software must know when to stop.

The platform is designed to organize decisions, not to make unsupported safety or regulatory declarations.

Hazard gate

A possible hazard, unknown contamination state, conflicting evidence or required professional review blocks automatic reuse and publication paths.

No structural certification

RubblePass can record professional evidence, but it does not certify that a component is structurally safe for reuse.

No guaranteed quantities or buyers

Ranges support planning. They do not guarantee measured quantities, a buyer, a facility acceptance decision or a commercial return.

Estimated is not verified

Projected environmental and commercial values remain separate from accepted weights, destination evidence and verified custody outcomes.

Start with evidence

See the workflow with every limitation left visible.

The demo walks through a fictional project, range estimates, a hazard gate, route comparison, an exchange step and a QR material passport.